Maximum Allowable Costs For School Construction - 2009

In accordance with RSA 198:15-b VII(a) the table below provides the maximum allowable cost per square foot for the purpose of calculating School Building Aid for projects which begin construction between April 1, 2009 and March 31, 2010. These cost limits apply to the gross building size of the school facility measured from exterior surface to exterior surface. Costs include the cost to erect the building from the foundation upwards including all building system equipment. The costs of land, site work, utilities, planning and design, legal and administrative fees, kitchen equipment, furniture, fixtures, and other equipment which is not part of a building system are not included.

Costs are derived from data from the R.S. Means Company. Costs are based on a 1200 pupil high school, 800 pupil middle school, and 400 pupil elementary school located at the county seat in each county. Cost limits are approximately 10% higher than last year. Costs in Carroll County have increased more than other counties using the R.S. Means estimates. The R.S. Means estimates for western areas of the state continue to be inexplicably low. For that reason, Cheshire, Sullivan, and Grafton counties have been assigned the cost limits for the next lowest county which is Coos.

School districts, designers, and construction firms should understand these costs to be the upper limit for the payment of school building aid. They are not intended to be an accurate estimate for the actual cost of construction for a particular design in current or future market conditions. Project budgets should be developed independent of these cost limits. Bidders should not assume that these limits represent the budget available for a particular project.

County Seat Zip High School
$/SF
Middle School
$/SF
Elementary School
$/SF
Belknap Laconia 03246 190 176 171
Carroll Ossipee 03864 191 180 175
Cheshire Keene 03431 170 154 148
Coos Stewartstown 03597 170 154 148
Grafton Haverhill 03774 170 154 148
Hillsborough Manchester 03101 193 181 176
Merrimack Concord 03301 190 176 171
Rockingham Exeter 03833 185 180 175
Strafford Dover 03820 185 180 175
Sullivan Newport 03773 170 154 148